Redtop Regional Pump Station, Gravity Sewer & Forcemain Div. 1

Charleston Water System, Charleston, SC
Contract: $6,880,258.00
Completed 2015

This was a design-build project with total cost being approximately $23,000,000.  Installed 27 5’-13’ manholes in steel sheeted pits that averaged 30’ deep.  Installed 3,479’ of 27” gravity sewer & 6’ ID manholes of which 2,094’ was 15’ cut up to 21’ cut.  Installed 2,526’ of 10” sewer & 5’ ID manholes of which 1,598’ was 15’ to 21’ cut.  Installed 6,725’ of 16” PVC forcemain, 3,965’ of 20” PVC forcemain, 644’ of 30” & 36” bored steel casing.  Clearing and restoration.