South Wastewater Transmission System Upgrade

Grand Strand Water & Sewer Authority, Myrtle Beach, SC
Contract: $10,632,472.00
Completed 2019

Install 18,150’ of 36” PVC force main, 50’ of 16” to 30” PVC force main, valves, fittings, ARV’s, 2,485’ of 42” HDPE drills, 330’ of 54” jack & bores, 24” check valve vault, 5 ea connections to existing system 16” to 36”, clearing and erosion control, paving, seeding, Wastewater booster station w/ 500KW generator & 2 ea 250 HP pumps.